The Mountain Road could be closed for longer than expected today after workers found problems at Brandywell.
The Department of Infrastructure says as they were setting up the TT one-way system, they discovered problems with surface water.
The section was resurfaced earlier this month after a contractor spilled bitumen - and a temporary closure on Wednesday couldn't fix the problem.
As a result, the DOI says today's closure is likely to be extended past its 4.30pm target while the work is carried out.
Huge floating book fair to arrive in Douglas next month
Stay safe for Hop Tu Naa tonight
Special Olympics fundraiser needs you
Peel ready for bonfire and fireworks later
Government: "UK never told us about child murderer"
Farm shop's newest worker needs your name suggestions
Bus Vannin gives update on staffing problems and routes affected today
Toilets vandalised for fourth time in a month